WEBVTT

1
00:00:00.111 --> 00:00:05.693
Today I'm bringing down one of the most complex and unique real estate transactions that we've ever completed at Sunrise Capital Investors.

2
00:00:06.273 --> 00:00:09.555
It was two separate acquisitions completed nearly a year apart from one another.

3
00:00:09.995 --> 00:00:14.176
It involved a parking garage that had been divided into four separate condominium units.

4
00:00:14.676 --> 00:00:21.119
The original developer owned the retail space in the first two levels of parking, while the city of Clearwater owned the remaining five levels of parking.

5
00:00:21.579 --> 00:00:23.060
but we wanted the entire garage.

6
00:00:23.300 --> 00:00:30.505
But when we committed to buying the developer's portion of the garage, we had no contractual certainty that the city would ever sell us their portion.

7
00:00:30.605 --> 00:00:37.950
And then after months of discussions with the mayor, the city manager, and the city council, a competing bidder appeared at essentially the last minute.

8
00:00:38.170 --> 00:00:42.872
That bidder happened to be the parking company that already was managing the city's portion of the garage.

9
00:00:43.332 --> 00:00:49.334
They had access to operating information that we did not have, and they submitted a bid just slightly higher than ours.

10
00:00:49.675 --> 00:00:53.096
And ultimately, we made the decision to sue the city of Clearwater.

11
00:00:53.536 --> 00:01:01.718
At the same time, while all this was happening, we were negotiating a 10-year triple net lease with another national parking operator backed by a corporate level guarantee.

12
00:01:01.878 --> 00:01:05.319
We ultimately assembled the property for approximately $33 million.

13
00:01:05.800 --> 00:01:08.780
Within about a year, it appraised for $48 million.

14
00:01:09.120 --> 00:01:10.461
So how do we find this opportunity?

15
00:01:11.141 --> 00:01:15.283
And why were we willing to purchase only a part of the garage before knowing whether we could assemble the rest?

16
00:01:15.463 --> 00:01:19.144
Why did we choose a triplet lease instead of a more traditional parking management agreement?

17
00:01:19.244 --> 00:01:30.689
And how did a deal involving fractured ownership, city politics, a public bid process, litigation, and three simultaneous negotiations become one of the most successful investments inside our portfolio?

18
00:01:30.989 --> 00:01:33.750
All right, guys, welcome back to the Real Estate Investing for Cashflow podcast.

19
00:01:34.090 --> 00:01:41.253
As many of you know, I recently started doing a new series where I take you behind the scenes of actual investments that we've made here at Sunrise Capital Investors.

20
00:01:41.433 --> 00:01:47.575
And when I say behind the scenes, I don't just mean sharing the purchase price, the revenue, and what the asset might be worth today.

21
00:01:47.955 --> 00:01:53.737
You know, those numbers are important, but what interests me more are the decisions you have to make before you know how the story ends.

22
00:01:53.997 --> 00:01:56.418
Because when you look at a successful investment five years later,

23
00:01:57.218 --> 00:01:58.359
everything can look obvious.

24
00:01:58.499 --> 00:02:05.326
You look at the acquisition price, you look at the current value, you look at the cash flow, and it's easy to say, of course, that was a great deal.

25
00:02:05.686 --> 00:02:08.870
But it rarely feels that obvious while you're actually living through it.

26
00:02:09.310 --> 00:02:18.319
You know, when you're in the middle of a transaction, you're making decisions based on incomplete information while real money, your reputation, and your investor's capital are all on the line.

27
00:02:18.639 --> 00:02:20.341
And Clearwater is a great example of that.

28
00:02:20.781 --> 00:02:24.502
The asset is the Pelican Walk parking garage located in Clearwater Beach, Florida.

29
00:02:24.942 --> 00:02:30.123
It's a 702-space parking garage with ground floor retail located approximately one block from the beach.

30
00:02:30.464 --> 00:02:36.905
We purchased the first portion of the garage in 2021, and we completed the second acquisition in 2022.

31
00:02:37.305 --> 00:02:40.886
The total purchase price was approximately $33.2 million.

32
00:02:41.526 --> 00:02:47.128
And while the numbers have been fantastic, the path to assembling the entire property was anything but straightforward.

33
00:02:47.868 --> 00:02:52.630
Let's begin with how this deal came across our desk, because this wasn't a marketed transaction.

34
00:02:52.650 --> 00:02:53.430
It wasn't on market.

35
00:02:53.450 --> 00:02:54.871
It wasn't being listed by a broker.

36
00:02:55.451 --> 00:02:57.752
There was no polished offering memorandum.

37
00:02:58.012 --> 00:03:01.073
There was no broker involved running an organized deal.

38
00:03:01.753 --> 00:03:05.314
The property wasn't formally for sale when the initial conversations even started.

39
00:03:05.955 --> 00:03:07.855
The opportunity came from a relationship.

40
00:03:08.015 --> 00:03:12.057
About a year and a half before the property surfaced, we attended a parking and street conference.

41
00:03:12.817 --> 00:03:18.702
At that conference, we met the owner of a parking operating company that had a significant presence in the Clearwater Beach market.

42
00:03:18.722 --> 00:03:25.007
You know, at that time, he was looking to grow his operating platform, and we were looking to expand our structured parking investment portfolio.

43
00:03:25.127 --> 00:03:27.929
So we did what we tried to do with nearly everyone that we meet in the business.

44
00:03:28.289 --> 00:03:29.310
We explained who we are.

45
00:03:29.891 --> 00:03:33.694
We explained what we're buying and the types of properties that we're seeking to acquire.

46
00:03:34.114 --> 00:03:36.135
And we explained why we love parking so much.

47
00:03:36.456 --> 00:03:41.660
And we simply said, if you come across an opportunity that fits what we're looking for, please bring it to us.

48
00:03:42.100 --> 00:03:45.182
As you can imagine, there was no immediate payoff from that initial conversation.

49
00:03:45.762 --> 00:03:51.986
We simply established a relationship, we stayed in contact, and we made sure that he understood that we were serious buyers.

50
00:03:52.806 --> 00:03:56.649
And about a year and a half later, that relationship produced the Clearwater Beach Opportunity.

51
00:03:56.869 --> 00:04:01.772
He became aware that the private developer who owned a portion of the garage might have an interest in selling.

52
00:04:02.252 --> 00:04:05.694
So he made an introduction, and that was the beginning of the transaction.

53
00:04:05.914 --> 00:04:09.116
People sometimes think deal sourcing is about finding the...

54
00:04:09.456 --> 00:04:13.078
the perfect cold calling script or subscribing to some secret database.

55
00:04:13.458 --> 00:04:27.686
And again, those things can be useful and surely have provided opportunities in the past, but I'd say that many of the best off-market opportunities come from consistently telling the right people what you do, building credibility with them, and then staying in front of them long enough for the timing to line up.

56
00:04:27.866 --> 00:04:30.808
And in this case, that relationship put us in that room.

57
00:04:31.088 --> 00:04:33.790
Here's where the story gets really unusual.

58
00:04:34.610 --> 00:04:38.516
This was not a traditional parking garage where one entity owned the entire structure.

59
00:04:38.756 --> 00:04:40.738
Property had a condo structure in place.

60
00:04:40.758 --> 00:04:43.902
And so the ground floor retail was one condominium unit.

61
00:04:44.203 --> 00:04:47.167
The seven parking levels were made up of four different condominium units.

62
00:04:47.487 --> 00:04:51.652
The original developer owned the ground floor retail condominium and the first two levels of parking.

63
00:04:52.113 --> 00:04:54.576
The city of Clearwater owned the remaining five parking levels.

64
00:04:55.056 --> 00:04:57.979
This ownership structure originated when the garage was originally developed.

65
00:04:58.039 --> 00:05:06.828
The developer and the city worked together to build a parking facility that would ultimately benefit the residents and the tourists there at Clearwater Beach, but they retained separate ownership interests.

66
00:05:07.228 --> 00:05:15.216
What made this opportunity unusual was the prospect of buying these different pieces separately and ultimately assembling the entire property under one ownership group.

67
00:05:15.376 --> 00:05:17.617
Our initial negotiation was with the private developer.

68
00:05:17.838 --> 00:05:20.519
It's important to note that he wasn't in any type of distress.

69
00:05:20.679 --> 00:05:21.940
There was no foreclosure.

70
00:05:22.080 --> 00:05:25.442
There was no lender forcing a sale or a debt maturity issue or anything like that.

71
00:05:26.083 --> 00:05:28.284
He had owned the property for roughly six years.

72
00:05:28.944 --> 00:05:34.508
He had built substantial equity in the project and had another large development project that required liquidity.

73
00:05:34.728 --> 00:05:41.610
And so as these things tend to go, he wanted to take some chips off the table and move that capital into another value-add retail project.

74
00:05:41.630 --> 00:05:45.291
And so he ultimately completed a 1031 exchange with those proceeds.

75
00:05:45.631 --> 00:05:48.872
Again, it was not a situation where we were buying from a desperate seller.

76
00:05:49.372 --> 00:05:52.753
Our capital and our timing simply aligned with his need for liquidity.

77
00:05:53.093 --> 00:05:54.794
As soon as we understood the opportunity,

78
00:05:55.434 --> 00:05:58.357
The quality of the real estate was quite apparent.

79
00:05:58.477 --> 00:06:01.940
Clearwater Beach is effectively in our backyard, you know, in the Tampa Bay area.

80
00:06:01.960 --> 00:06:03.041
That's where we're based out of.

81
00:06:03.201 --> 00:06:08.045
And the garage was located approximately one block from the number one beach in the country, Clearwater Beach.

82
00:06:08.246 --> 00:06:10.468
You know, it's surrounded by hotels, resorts,

83
00:06:11.148 --> 00:06:13.630
restaurant shops, nightlife, there's marinas.

84
00:06:14.070 --> 00:06:16.251
You've got Pier 60, which is a major tourist attraction.

85
00:06:16.892 --> 00:06:21.455
Lots of different local events throughout the year, and an enormous amount of tourism-driven activity.

86
00:06:21.635 --> 00:06:24.216
But the location was only one part of the story.

87
00:06:24.517 --> 00:06:26.878
The supply dynamics were equally attractive to us.

88
00:06:27.438 --> 00:06:32.702
There was already a moratorium in place that prohibited new standalone parking garages from being built on Clearwater Beach.

89
00:06:32.722 --> 00:06:39.806
So that does not mean that a new hotel or a condominium can't include parking for its own residents or guests, but another developer simply

90
00:06:41.187 --> 00:06:45.049
acquire a parcel of land and build another standalone public parking garage to compete with us.

91
00:06:45.409 --> 00:06:48.270
At the same time, existing parking supply was shrinking.

92
00:06:48.470 --> 00:06:56.433
A lot of the different surface lots located throughout Clearwater Beach were being redeveloped into hotels, condominiums, different types of resorts, and other mixed-use projects.

93
00:06:56.953 --> 00:07:01.835
And when those properties are developed, the developers generally build only enough parking to serve their own project.

94
00:07:02.356 --> 00:07:08.278
So, as you can imagine, every time a surface lot is redeveloped, a portion of the parking supply disappears.

95
00:07:08.658 --> 00:07:10.799
Now, think about that dynamic for a moment.

96
00:07:11.160 --> 00:07:13.601
Demand is being supported by, again, tourism.

97
00:07:14.102 --> 00:07:15.122
There's population growth.

98
00:07:15.142 --> 00:07:16.503
You've got the hotels in the area.

99
00:07:16.523 --> 00:07:20.406
You've got restaurants and beaches, entertainment, and continued investment in that market.

100
00:07:20.446 --> 00:07:27.450
Meanwhile, parking supply is constrained and actually declining as service lots disappear and they get developed into different types of projects.

101
00:07:27.610 --> 00:07:30.132
That is exactly the type of supply, demand, and balance that we look for.

102
00:07:30.632 --> 00:07:35.915
And another exciting part of this transaction was that the garage itself was relatively new.

103
00:07:36.495 --> 00:07:38.376
It was actually built around 2015.

104
00:07:38.436 --> 00:07:41.478
And when we began looking at it, it was only about six years old.

105
00:07:41.838 --> 00:07:47.041
It wasn't your typical aging concrete structure with, you know, sometimes decades of deferred concrete work.

106
00:07:47.581 --> 00:07:50.303
From the beginning, we viewed it as irreplaceable real estate.

107
00:07:50.443 --> 00:07:59.628
We were being offered the opportunity to earn an attractive current yield while owning an asset that would be incredibly difficult, if not impossible, to replicate.

108
00:08:00.028 --> 00:08:01.969
Now, let's get into the risk of it all.

109
00:08:02.289 --> 00:08:03.950
Again, we wanted the entire garage.

110
00:08:03.970 --> 00:08:05.831
We didn't just want a small piece of it.

111
00:08:05.851 --> 00:08:07.191
We wanted the entire garage.

112
00:08:07.271 --> 00:08:13.554
We did not want to own just the first two parking levels while, again, the city of Clearwater controlled the remaining five.

113
00:08:14.034 --> 00:08:15.375
We prefer control, 100% control.

114
00:08:16.555 --> 00:08:24.958
And when you only own part of that structure, even relatively simple decisions, as you can imagine, can become much more complicated when you've got a partner in a deal.

115
00:08:24.978 --> 00:08:27.599
You know, who controls the capital improvements?

116
00:08:27.959 --> 00:08:29.019
Who approves those changes?

117
00:08:29.640 --> 00:08:32.381
What happens if there are future redevelopment opportunities that exist?

118
00:08:32.721 --> 00:08:35.702
And what happens if only one party wants to sell and the other one doesn't?

119
00:08:36.182 --> 00:08:44.044
What happens if 10 or 15 years down the road, if maybe the highest and best use is no longer parking and it's a better opportunity to redevelop it?

120
00:08:44.364 --> 00:08:46.545
We want full decision-making authority.

121
00:08:46.585 --> 00:08:48.765
We want complete autonomy of how we run the garage.

122
00:08:49.225 --> 00:08:54.307
But when we committed to buy the developer's portion, we did not have a binding agreement with the city just yet.

123
00:08:54.947 --> 00:08:57.149
We did have productive conversations with the city.

124
00:08:57.189 --> 00:09:03.095
We had indications of their potential interest to sell, but there was no absolute certainty.

125
00:09:03.656 --> 00:09:13.666
And if you had asked me at the beginning of this transaction what probability I assigned to successfully buying the city's portion, I probably would have said somewhere around 70%.

126
00:09:13.846 --> 00:09:16.129
But 70%, it's not 100%, right?

127
00:09:16.169 --> 00:09:18.051
So why were we willing to proceed with the deal?

128
00:09:18.471 --> 00:09:22.276
Well, because we actually underwrote the first acquisition to stand on its own.

129
00:09:22.316 --> 00:09:26.141
It didn't depend on us acquiring the portion from the city.

130
00:09:26.702 --> 00:09:33.912
We paid approximately $20.7 million for the developer's portion of the garage, which included the retail and the first two parking levels.

131
00:09:34.332 --> 00:09:37.754
The economics actually made sense, even if we never acquired the remaining five floors.

132
00:09:38.135 --> 00:09:44.319
In fact, the first two parking levels generated approximately 70% of the normal daily transient parking demand from beachgoers.

133
00:09:45.020 --> 00:09:47.101
Drivers naturally take the first available space.

134
00:09:47.421 --> 00:09:48.742
They prefer the lower levels.

135
00:09:48.802 --> 00:09:51.184
Those are typically the first couple levels of the garage.

136
00:09:51.644 --> 00:09:57.948
The upper floors become increasingly important on peak weekends, holidays, spring break, and other types of major events.

137
00:09:57.989 --> 00:10:01.151
But the first two floors captured the majority of the regular traffic.

138
00:10:01.671 --> 00:10:06.234
And so if the city never sold, we still believe that we own a great investment.

139
00:10:06.474 --> 00:10:10.936
But owning the entire structure would turn a good investment into a significantly better one.

140
00:10:10.976 --> 00:10:12.557
The downside case, it still worked.

141
00:10:12.937 --> 00:10:15.899
The upside case gave us full control and substantially more value.

142
00:10:16.139 --> 00:10:20.781
The parking operator who introduced us to the developer also had prior relationships with the city of Clearwater.

143
00:10:21.322 --> 00:10:22.722
He made the warm introduction for us.

144
00:10:23.263 --> 00:10:28.826
We then began a series of conversations with the mayor, the city manager, and the city council.

145
00:10:29.366 --> 00:10:31.428
And you know, our position was, it was fairly straightforward.

146
00:10:31.488 --> 00:10:34.191
The city has substantial equity tied up in this parking asset.

147
00:10:34.231 --> 00:10:37.875
They also had a another large project that they were working on that needed capital.

148
00:10:37.895 --> 00:10:38.716
And we were aware of that.

149
00:10:38.876 --> 00:10:43.701
And by selling its portion of the garage, the city could unlock that equity and redirect it into other priorities.

150
00:10:44.362 --> 00:10:47.343
The garage could move into a unified private partnership.

151
00:10:47.363 --> 00:10:49.884
You know, operations would ultimately become more efficient.

152
00:10:50.204 --> 00:10:53.325
And the city would be able to monetize an asset that they helped create.

153
00:10:53.545 --> 00:10:58.167
You know, from our perspective, it appeared to be a win-win for everyone involved.

154
00:10:58.207 --> 00:11:04.309
You know, the city even identified what they felt was a general price point that would justify the transaction.

155
00:11:04.970 --> 00:11:06.710
The price was approximately $12.5 million.

156
00:11:06.970 --> 00:11:13.633
And based on the financial performance of the upper five floors, we did not believe that there would be significant outside competition.

157
00:11:14.393 --> 00:11:21.458
A buyer of only those upper five floors would not control the retail or the first two, which are the most productive parking levels.

158
00:11:21.838 --> 00:11:26.160
They would only be buying in the same fractured ownership structure that we were trying to eliminate.

159
00:11:26.541 --> 00:11:29.783
And so our assumption was that we would likely be the only logical bidder.

160
00:11:30.363 --> 00:11:32.445
That assumption turned out to be completely wrong.

161
00:11:32.625 --> 00:11:37.149
Because the property was publicly owned, the city couldn't just simply sell it based on a handshake.

162
00:11:37.489 --> 00:11:40.451
It was actually required by mandate to run a public bid process.

163
00:11:40.491 --> 00:11:41.372
And we knew that.

164
00:11:41.432 --> 00:11:43.154
I mean, that was part of the initial conversations.

165
00:11:43.234 --> 00:11:45.516
And we agreed, obviously, to participate.

166
00:11:45.956 --> 00:11:52.882
And based on the unusual ownership structure, we entered the process believing there would be a very high probability that we would be successful.

167
00:11:53.762 --> 00:11:56.685
For most of the process, that appeared to be exactly what was happening.

168
00:11:57.245 --> 00:11:59.207
There was no obvious competing buyer.

169
00:11:59.367 --> 00:12:00.367
Then that all changed.

170
00:12:00.467 --> 00:12:06.292
And within approximately 24 hours of the bid process coming to an end, another bidder appeared.

171
00:12:06.492 --> 00:12:07.953
And this just wasn't any bidder.

172
00:12:08.253 --> 00:12:12.276
It was the parking management company that was already operating the garage on behalf of the existing ownership.

173
00:12:12.696 --> 00:12:16.579
This is the same company that had direct access to the day-to-day operating information.

174
00:12:16.839 --> 00:12:23.524
And then suddenly, at the last minute, in the 11th hour, they submitted a bid that was only a few hundred thousand dollars higher than ours.

175
00:12:23.964 --> 00:12:25.406
Now, here was the problem.

176
00:12:25.786 --> 00:12:29.731
You know, the most recent financials that we had received were approximately six months old.

177
00:12:30.372 --> 00:12:36.599
The existing parking manager, by contrast, had access to current daily operating information because it was actually running the garage.

178
00:12:36.619 --> 00:12:37.880
They were handling the day-to-day.

179
00:12:38.080 --> 00:12:40.243
They knew exactly how the property was performing and they knew exactly how the property was

180
00:12:40.663 --> 00:12:41.964
They knew its current revenue.

181
00:12:42.004 --> 00:12:43.305
They knew the traffic counts.

182
00:12:43.705 --> 00:12:45.646
They knew the different trends that were happening.

183
00:12:46.066 --> 00:12:49.828
And then it submitted a bid just slightly above ours in the final hours.

184
00:12:50.168 --> 00:12:52.289
We felt this was a clear conflict of interest.

185
00:12:52.670 --> 00:12:56.812
At a minimum, we did not believe everyone had been operating with the same information.

186
00:12:57.152 --> 00:13:03.556
So after all the discussions, all the work, and all the time that we had invested in this transaction, we were suddenly at the risk of losing the property.

187
00:13:03.956 --> 00:13:05.697
This was not a decision that we took lightly.

188
00:13:05.717 --> 00:13:06.157
Right.

189
00:13:06.357 --> 00:13:08.860
Suing a municipality, it's serious, as you can imagine.

190
00:13:08.900 --> 00:13:09.681
It's expensive.

191
00:13:09.721 --> 00:13:10.662
It's time-consuming.

192
00:13:11.543 --> 00:13:15.107
It surely can damage any relationships, and there's no guarantee that you're going to win.

193
00:13:15.587 --> 00:13:23.596
And we had to decide as a team, as a company, we had to decide whether to accept the outcome and move on or fight for what we believe was a fair process.

194
00:13:24.137 --> 00:13:24.938
And we chose to fight.

195
00:13:25.558 --> 00:13:29.340
Our position was not simply, you know, we don't like the fact that someone bid more than us.

196
00:13:30.221 --> 00:13:31.101
That would not have been enough.

197
00:13:31.421 --> 00:13:39.506
Our main concern was that the competing bidder appeared to have access to materially more current financial information than we had received through the formal bid process.

198
00:13:40.007 --> 00:13:46.771
And that bidder used this position as the existing manager of the garage to enter at the last minute with a bid only slightly above ours.

199
00:13:47.391 --> 00:13:49.693
And we believe that that truly created the conflict.

200
00:13:49.913 --> 00:13:56.579
Now, believe me, there were many times during this process when the easier path for us would have just been to walk away.

201
00:13:57.119 --> 00:14:00.362
And sometimes walk away, it's the right decision to make.

202
00:14:01.383 --> 00:14:03.345
And we have walked away from plenty of deals.

203
00:14:03.805 --> 00:14:15.195
But there are many other times, this one being one of those times when you have to, you've got to make the decision whether the value of the opportunity itself justifies the additional, the cost, the time, the stress,

204
00:14:16.015 --> 00:14:18.296
a lot of the uncertainty required to protect your position.

205
00:14:18.916 --> 00:14:20.217
In this case, we believe that it did.

206
00:14:20.397 --> 00:14:27.160
The litigation process lasted roughly four or five months, possibly a little longer than that, and we spent a few hundred thousand dollars on legal fees.

207
00:14:27.560 --> 00:14:36.144
There was no certainty that we would ultimately prevail, and again, our original estimate of a 70% chance of completing the assemblage dropped considerably.

208
00:14:37.204 --> 00:14:43.345
There were many, many moments when we generally did not know whether we would ever own the upper five floors.

209
00:14:43.885 --> 00:14:48.266
And again, as you can imagine, on an emotional level, that was very frustrating.

210
00:14:48.286 --> 00:14:55.007
We had challenges with that lack of certainty or just the frustration associated with this process.

211
00:14:55.167 --> 00:15:02.108
We had spent significant time building relationships and working through what we believed was a logical transaction for all the parties involved.

212
00:15:02.648 --> 00:15:05.469
Then this unexpected complication appeared in the final moments.

213
00:15:05.809 --> 00:15:13.656
But as we always do, the team and I and the rest of the partners in the company, we stayed committed to the process and ultimately we were successful.

214
00:15:14.297 --> 00:15:17.140
We were awarded the right to acquire the city's portion.

215
00:15:17.360 --> 00:15:24.706
We did have to pay slightly more than we initially anticipated, but we were able to purchase the upper five parking levels for approximately $12.5 million.

216
00:15:25.367 --> 00:15:27.208
The two-part assemblage was complete.

217
00:15:27.608 --> 00:15:34.911
Now, we actually controlled the retail and all seven levels of the garage, but gaining control of the real estate was only one piece of the business plan.

218
00:15:35.211 --> 00:15:40.513
While all this was happening, we were simultaneously negotiating the part of the deal that would drive much of the economic value.

219
00:15:40.953 --> 00:15:48.479
While the negotiations with the developer and the city were taking place, we were also in negotiations with the parking operator who originally brought us the opportunity.

220
00:15:48.599 --> 00:15:51.561
This operator already has significant presence in the Clearwater Beach Market.

221
00:15:51.582 --> 00:15:53.003
They knew it like the back of their hand.

222
00:15:53.823 --> 00:15:56.445
They understood the daily and the seasonal parking patterns.

223
00:15:56.826 --> 00:16:00.128
And they believe that this garage was substantially underperforming its potential.

224
00:16:00.469 --> 00:16:06.253
And because the operator had brought us this opportunity, we gave them the first right to submit a proposal to operate the property.

225
00:16:06.453 --> 00:16:09.636
But we were not interested in simply signing a standard management agreement.

226
00:16:09.916 --> 00:16:14.259
Under a traditional management agreement, we would essentially own the parking business.

227
00:16:14.639 --> 00:16:23.845
You would have a day-by-day manager in place, but at the end of the day, there is no guarantee of top-line revenue or NOI at the parking facility.

228
00:16:24.245 --> 00:16:26.647
It would be somewhat contingent on their ability to perform.

229
00:16:27.047 --> 00:16:36.714
Sunrise and our investors, we would remain exposed to fluctuations in tourism, labor, maintenance, equipment, and again, the day-to-day performance of the facility.

230
00:16:37.034 --> 00:16:39.656
Instead, we negotiated a 10-year triple net lease.

231
00:16:39.796 --> 00:16:43.378
The initial annual base rent was just shy of $2.1 million.

232
00:16:43.818 --> 00:16:45.700
In year two, the rent increase was 3%.

233
00:16:45.940 --> 00:16:48.382
In year three, it increased by 4%.

234
00:16:48.542 --> 00:16:53.665
Then from year four through the end of the 10-year term, it increased by 5% annually.

235
00:16:53.785 --> 00:16:56.467
That created a powerful stream of contractual NOI growth.

236
00:16:56.607 --> 00:17:00.770
And then we also negotiated a corporate level guarantee from the operator's national parent company.

237
00:17:00.930 --> 00:17:07.175
And I want to point out that having a corporate level guarantee is not all that common on a parking lease of this scale.

238
00:17:07.755 --> 00:17:10.497
The lease was fully executed before we closed on the property.

239
00:17:10.858 --> 00:17:12.759
It was structured in two different stages.

240
00:17:13.099 --> 00:17:16.001
The first stage covered the developer's two parking levels.

241
00:17:16.442 --> 00:17:22.066
And if we successfully acquired the city's five floors, the second stage expanded the lease to cover the entire garage.

242
00:17:22.326 --> 00:17:23.267
So before we spent the

243
00:17:23.847 --> 00:17:27.429
the acquisition capital, we already knew the economics of the parking lease.

244
00:17:27.949 --> 00:17:29.970
That was our primary value creation lever.

245
00:17:30.310 --> 00:17:33.151
Some listeners might be asking the obvious question here.

246
00:17:33.552 --> 00:17:38.114
If the parking operation had so much upside, why do we not retain all that upside for ourselves?

247
00:17:38.538 --> 00:17:49.842
Why not just sign a more standardized management agreement, go in and increase the rates, implement dynamic pricing, upgrade the technology, and keep the additional operating profit for ourselves?

248
00:17:50.202 --> 00:17:52.123
And that's a very fair question.

249
00:17:52.863 --> 00:18:01.167
And the answer really comes down to our understanding and definition of risk-adjusted returns and really understanding where each party creates the most value.

250
00:18:01.627 --> 00:18:04.408
The parking operator's core competency was running parking facilities.

251
00:18:04.928 --> 00:18:07.910
Again, they understood pricing, they understood traffic and operations.

252
00:18:08.271 --> 00:18:11.393
They really intimately understood the Clearwater Beach consumer.

253
00:18:11.813 --> 00:18:16.816
Our core competency was identifying, structuring, capitalizing, and then owning the real estate.

254
00:18:17.297 --> 00:18:20.199
The Trevenant lease allowed each party to focus on what they did best.

255
00:18:20.519 --> 00:18:33.102
Under the lease, the operator was responsible for essentially all the parking level operating expenses, including things like labor, utilities, maintenance, insurance, equipment, taxes, repairs, and also technology.

256
00:18:33.642 --> 00:18:38.723
From Sunrise's perspective, we received a fixed contractual rent with annual increases.

257
00:18:38.923 --> 00:18:43.744
And so that allowed us to essentially shift a substantial amount of the operating risk over to the tenant.

258
00:18:44.084 --> 00:18:47.885
You know, if a hurricane reduced tourism for a period, the rent was still due.

259
00:18:48.545 --> 00:18:51.669
If labor costs increased, that was the operator's responsibility.

260
00:18:52.290 --> 00:18:56.456
If transient parking softened for one reason or another, that was also the operator's risk.

261
00:18:56.997 --> 00:19:00.582
If technology needed to be upgraded, again, that was the operator's obligation.

262
00:19:00.882 --> 00:19:04.167
The operator also carried business interruption and loss of income insurance, and so

263
00:19:04.807 --> 00:19:07.929
That corporate guarantee gave us another layer of added protection.

264
00:19:08.049 --> 00:19:15.912
And you probably ask yourself, you know, did the operator then still with that base lease in place, did they retain an opportunity to generate additional profit?

265
00:19:16.492 --> 00:19:17.133
Of course they did.

266
00:19:17.733 --> 00:19:19.454
They would not have signed the lease otherwise.

267
00:19:19.814 --> 00:19:23.515
But we didn't really view that as upside that we just foolishly gave away.

268
00:19:23.836 --> 00:19:26.417
We really viewed it as a structure where both parties could win.

269
00:19:27.117 --> 00:19:39.590
Again, we secured a strong real estate return with contractual growth and limiting operating exposure, while the operator used its intimate market knowledge and operational capabilities to generate profit above these lease payments.

270
00:19:39.790 --> 00:19:44.154
And after years of owning this garage, I would still absolutely choose a triple-nut lease again.

271
00:19:44.455 --> 00:19:49.239
What gave the operator the confidence that it could support more than $2 million of annual rent?

272
00:19:49.900 --> 00:19:52.284
The existing operation was dramatically below market.

273
00:19:52.504 --> 00:19:58.112
When we began actually underwriting this garage, the standard hourly parking rate was approximately $3.

274
00:19:58.353 --> 00:20:03.780
Comparable garages and parking lots in the immediate marketplace there in Clearwater Beach were charging at least $6 an hour.

275
00:20:04.842 --> 00:20:07.645
And as you can imagine, again, that difference is not all that subtle.

276
00:20:08.366 --> 00:20:11.829
And the existing garage had virtually no meaningful dynamic pricing in place.

277
00:20:12.410 --> 00:20:16.053
Parking demand on Clearwater Beach is not the same every hour of every day.

278
00:20:16.474 --> 00:20:19.797
You know, a normal weekday morning is different from a Saturday during spring break.

279
00:20:20.278 --> 00:20:22.780
A quiet evening is very different from a holiday weekend.

280
00:20:22.820 --> 00:20:26.444
Yet the historical pricing model did not adequately account for those demand spikes.

281
00:20:26.624 --> 00:20:35.887
You know, on certain weekends, you know, different holidays and high demand periods, parking can generate flat fees of $40, $50, and potentially even more for that for a single stay.

282
00:20:36.227 --> 00:20:38.327
But pricing was not the only inefficiency here.

283
00:20:38.647 --> 00:20:44.849
The technology or, you know, the license plate recognition system that was in place was outdated and it was missing vehicles.

284
00:20:44.869 --> 00:20:47.110
So people were basically parking for free.

285
00:20:47.710 --> 00:20:50.272
You know, the gate equipment and soft floor, they were also outdated.

286
00:20:50.912 --> 00:20:53.914
Ingress and egress was very inefficient of how it was currently set up.

287
00:20:54.555 --> 00:20:58.578
Also, the staffing, it was inadequate during peak periods when it was needed the most.

288
00:20:59.238 --> 00:21:00.359
Signage was very weak.

289
00:21:00.379 --> 00:21:02.460
Some folks didn't even know the parking garage existed.

290
00:21:02.881 --> 00:21:05.462
Online reservations didn't exist at that point in time.

291
00:21:05.482 --> 00:21:10.306
And all those issues, as you can imagine, they represent an opportunity for an experienced operator.

292
00:21:10.446 --> 00:21:14.529
Someone that's already got the operational expertise of the marketplace and the infrastructure in place.

293
00:21:15.149 --> 00:21:22.654
And because the lease was negotiated before closing, we didn't have to buy the garage and then hope that those improvements would eventually justify the acquisition.

294
00:21:23.295 --> 00:21:28.118
We converted much of that operational upside into a contractual rent stream before we ever even closed.

295
00:21:28.358 --> 00:21:30.120
And parking was not the only income stream.

296
00:21:30.640 --> 00:21:33.383
Again, the ground floor retail was another meaningful part of the investment.

297
00:21:33.663 --> 00:21:39.009
At acquisition, the retail generated approximately $530,000 of annual NOI across six different tenants.

298
00:21:39.549 --> 00:21:46.376
The weighted average remaining lease term was approximately six years, really just giving us strong income durability with limited near-term rollover.

299
00:21:46.776 --> 00:21:49.139
There was also meaningful mark-to-market opportunity.

300
00:21:49.339 --> 00:21:52.022
Historically, some of those retail spaces had increased.

301
00:21:52.362 --> 00:21:55.587
been leased in the range of $31 to $32 per square foot.

302
00:21:56.027 --> 00:22:04.479
As the leases have rolled now over the couple of years that we've owned it, we've been able to execute new leases closer to $40 per square foot, and in some cases, above $40 a foot.

303
00:22:04.699 --> 00:22:06.722
Let's bring all the economics together here.

304
00:22:07.303 --> 00:22:10.826
We paid approximately $20.7 million for the developer's portion.

305
00:22:11.187 --> 00:22:13.990
We paid roughly $12.5 million for the city's portion.

306
00:22:14.350 --> 00:22:19.295
So all in, the total purchase price was roughly $33.2 million.

307
00:22:19.895 --> 00:22:24.140
The initial parking lease produced just shy of $2.1 million of annual base rent.

308
00:22:24.520 --> 00:22:26.382
The retail produced approximately $530,000 of annual NOI.

309
00:22:28.744 --> 00:22:32.486
Combined, that gave us roughly $2.6 million of NOI at acquisition.

310
00:22:33.326 --> 00:22:38.949
On a purchase price of $33 million, that equated to an acquisition cap rate of roughly 7.9%.

311
00:22:40.070 --> 00:22:41.651
So essentially an 8% cap rate.

312
00:22:41.711 --> 00:22:47.213
On a newer built, core quality asset, one block from the number one beach in the country, Clearwater Beach.

313
00:22:47.614 --> 00:22:55.958
We have limited capital expenditure needs, a 10-year parking lease in place, a corporate guarantee, and also contractual rent increases year after year.

314
00:22:56.678 --> 00:23:00.201
And remember, this was not a stabilized 8% return with no growth.

315
00:23:00.621 --> 00:23:02.503
The parking lease had embedded increases.

316
00:23:02.963 --> 00:23:06.066
The retail had annual increases and future mark-to-market potential.

317
00:23:06.706 --> 00:23:09.448
The public parking supply was already shrinking, as I had mentioned.

318
00:23:09.969 --> 00:23:11.690
New standalone parking, it was prohibited.

319
00:23:11.710 --> 00:23:14.453
There was a moratorium, so we don't have to worry about immediate competition.

320
00:23:15.133 --> 00:23:17.516
And now we control the entirety of the asset.

321
00:23:17.896 --> 00:23:19.498
The debt structure also worked in our favor.

322
00:23:19.838 --> 00:23:23.362
We financed the acquisition through a local bank that was already very familiar with the property.

323
00:23:23.943 --> 00:23:26.305
The bank had actually financed the asset for the original developer.

324
00:23:26.786 --> 00:23:32.632
It understood the condominium structure and understood the ownership history between the private developer and the city.

325
00:23:33.072 --> 00:23:37.015
and that familiarity made the two-stage acquisition much easier to finance.

326
00:23:37.375 --> 00:23:41.938
The bank understood the complexities of the deal, and they initially approved financing for the developer's portion.

327
00:23:42.239 --> 00:23:50.485
The loan documents then included provisions allowing the bank to simply advance additional proceeds if and when we successfully acquired the city's portion.

328
00:23:50.765 --> 00:23:55.088
Once we closed the second acquisition, the loan covered the entire garage and retail component.

329
00:23:55.508 --> 00:23:57.529
The total loan amount was just over $20 million.

330
00:23:57.589 --> 00:24:02.152
The original leverage was approximately 60%, although I don't want to represent that as an exact number.

331
00:24:02.432 --> 00:24:09.517
The loan was fixed at approximately 5.64%, amortized over roughly 25 years, and it was a non-recourse loan.

332
00:24:09.697 --> 00:24:12.839
Today, we still have roughly six years remaining on that financing.

333
00:24:13.399 --> 00:24:16.521
We actually considered a cash-out refinance within the first year of ownership.

334
00:24:16.801 --> 00:24:21.764
We actually went through the process and we obtained a formal appraisal, and the property appraised at $48 million.

335
00:24:21.784 --> 00:24:22.224
$48 million.

336
00:24:23.325 --> 00:24:24.805
Now think about those numbers for a second.

337
00:24:25.186 --> 00:24:27.866
We assembled the entire asset for roughly $33 million.

338
00:24:28.126 --> 00:24:32.768
And then within roughly a year, the property appraised for $48 million.

339
00:24:33.228 --> 00:24:36.429
That represents approximately $15 million of value creation.

340
00:24:36.609 --> 00:24:41.250
And that value wasn't created by, you know, waiting 10 years for the general market to appreciate that.

341
00:24:41.790 --> 00:24:44.051
It really came from the structure of the transaction.

342
00:24:44.071 --> 00:24:45.993
You know, we assembled the entirety of the deal.

343
00:24:46.093 --> 00:24:47.654
We put the triple net lease in place.

344
00:24:47.674 --> 00:24:56.079
Again, the income had already been locked in and gaining full control of an irreplaceable asset in the incredible market was paramount to the value add proposition.

345
00:24:56.559 --> 00:25:01.422
After receiving the $48 million appraisal, we had the option to explore a cash out refinance.

346
00:25:01.722 --> 00:25:05.105
But just because you can extract equity does not mean that you always should.

347
00:25:05.506 --> 00:25:09.329
You know, we already had an attractive non-recourse fixed rate debt in place.

348
00:25:09.730 --> 00:25:14.975
Our total loan was just over $20 million against a property valued at now nearly $48 million.

349
00:25:15.475 --> 00:25:19.019
And as you can imagine, that created an extremely conservative loan to value ratio.

350
00:25:19.559 --> 00:25:21.320
and interest rates later increased.

351
00:25:21.640 --> 00:25:25.442
So we chose to preserve the financing rather than chase short-term liquidity.

352
00:25:25.703 --> 00:25:32.306
As the years move on, we'll more than likely revisit refinancing or other liquidity event as we approach the existing loan maturity.

353
00:25:32.346 --> 00:25:34.547
But today, there's no urgency whatsoever.

354
00:25:34.567 --> 00:25:42.312
Again, we sleep well at night, we've got a low loan to value, the property's performing, the debt's very attractive now, given where interest rates are at today.

355
00:25:42.952 --> 00:25:45.414
The contractual rent increases will continue to increase.

356
00:25:45.454 --> 00:25:48.277
And again, this property will continue gaining value year after year.

357
00:25:48.637 --> 00:25:52.340
The asset has performed almost exactly according to our original underwriting.

358
00:25:52.660 --> 00:25:55.562
The lease escalators have occurred as we've written in the lease.

359
00:25:55.602 --> 00:25:56.723
The 3% increase happened.

360
00:25:56.743 --> 00:25:58.084
The 4% increase happened.

361
00:25:58.385 --> 00:26:00.826
And the 5% annual increases have continued.

362
00:26:01.127 --> 00:26:03.388
The operator has honored its lease obligations.

363
00:26:04.109 --> 00:26:06.411
We have also had a couple real-world stress tests here.

364
00:26:06.671 --> 00:26:13.479
Just a few short years ago, we experienced two significant hurricane events that negatively affected tourism and parking activity in Clearwater Beach.

365
00:26:14.540 --> 00:26:20.546
Those events, as you can imagine, impacted the operator's business, but they did not prevent us from collecting our contractual rent.

366
00:26:21.027 --> 00:26:26.553
The operator's insurance program, including their loss of income protection, really helped support its obligations.

367
00:26:27.153 --> 00:26:30.074
The property itself was also relatively new at acquisition.

368
00:26:30.454 --> 00:26:32.315
Again, it was built around 2015.

369
00:26:32.415 --> 00:26:38.517
So we didn't inherit a 40-year-old coastal garage with decades of deferred concrete repairs.

370
00:26:39.197 --> 00:26:42.358
The ongoing capital needs have been relatively modest here.

371
00:26:42.798 --> 00:26:49.060
And under the triple net lease structure, the tenant is responsible for the parking-related maintenance obligations, but we maintain oversight.

372
00:26:49.280 --> 00:26:58.923
And that's important to note here because one challenge that I commonly see with tripping out lease structures is that the tenant may define adequate maintenance differently than the long-term owner.

373
00:26:59.583 --> 00:27:02.564
An operator naturally cares more about keeping the garage functioning.

374
00:27:03.084 --> 00:27:05.865
We care about preserving the asset for many, many decades to come.

375
00:27:06.385 --> 00:27:10.566
So the lease gives us the right to inspect, require work, and intervene when necessary.

376
00:27:10.806 --> 00:27:14.627
And that is exactly what I mean when I describe parking as a cash-flowing land investment.

377
00:27:14.647 --> 00:27:14.947
Right.

378
00:27:15.187 --> 00:27:18.868
We are being paid an attractive current yield to own irreplaceable real estate.

379
00:27:19.328 --> 00:27:26.891
And because we control the entire structure, you know, if someday parking is no longer the highest and best use for that property, we also control that decision too.

380
00:27:27.211 --> 00:27:28.331
I am proud of the economics.

381
00:27:28.492 --> 00:27:34.534
I'm proud that we bought the property at roughly $33 million and then appraised for $48 million within a year.

382
00:27:34.974 --> 00:27:36.834
I'm proud of the income that we've been on the crane.

383
00:27:36.854 --> 00:27:38.575
I'm proud of the lease structure, the debt.

384
00:27:38.875 --> 00:27:39.975
that we've been able to put in place.

385
00:27:39.995 --> 00:27:43.036
And I'm proud of the investor outcome in this one.

386
00:27:43.076 --> 00:27:45.677
But I'm equally proud of what the transaction says about our team.

387
00:27:45.937 --> 00:27:48.297
We did not quit when ownership was complicated.

388
00:27:48.697 --> 00:27:51.318
We did not quit when the city required a public bid process.

389
00:27:51.638 --> 00:27:56.099
We also, we didn't quit when there was a competing bidder that appeared, again, in the 11th hour of the transaction.

390
00:27:56.859 --> 00:27:59.460
And we didn't quit when litigation became necessary.

391
00:27:59.980 --> 00:28:01.740
We brought in the right legal counsel.

392
00:28:01.780 --> 00:28:04.381
We spent the amount of money required to build an argument.

393
00:28:04.721 --> 00:28:08.502
And we continued managing developer acquisition while pursuing the city portion.

394
00:28:08.842 --> 00:28:11.704
And we continue negotiating the lease and we continue to work with the lender.

395
00:28:12.084 --> 00:28:16.767
And ultimately, at the end of all this, we found a way to assemble the entire property.

396
00:28:17.067 --> 00:28:20.829
And that figure it out mentality is deeply embedded in our culture at Sunrise.

397
00:28:21.249 --> 00:28:23.490
It doesn't mean that we're reckless by any means.

398
00:28:23.530 --> 00:28:25.652
In fact, we don't support recklessness.

399
00:28:25.852 --> 00:28:29.054
It does not mean refusing to walk away when a deal turns bad.

400
00:28:29.734 --> 00:28:32.595
It simply means that we believe in the real estate.

401
00:28:32.955 --> 00:28:39.157
When the downside is protected and when there is a legitimate path forward, we do not allow complexity alone to scare us away.

402
00:28:39.498 --> 00:28:43.559
Because in my heart of heart, I believe that complexity often creates the opportunity.

403
00:28:43.939 --> 00:28:45.780
Let me leave you with three takeaways from this deal.

404
00:28:46.260 --> 00:28:51.482
First and foremost, you don't need complete certainty to move forward, but you do need a downside case that works.

405
00:28:51.662 --> 00:28:55.987
We bought the developers portion knowing that there was a real possibility that the city might never sell.

406
00:28:56.187 --> 00:28:59.390
But the first two floors in the retail support the investment on their own.

407
00:28:59.650 --> 00:29:02.233
We did not need the uncertain outcome to rescue the deal.

408
00:29:02.774 --> 00:29:05.857
And that distinction is what made the risk calculated rather than reckless.

409
00:29:06.678 --> 00:29:09.461
Second, value creation can begin before you ever close.

410
00:29:10.081 --> 00:29:14.163
Our primary value creation level was not something we discovered six months after acquisition.

411
00:29:14.604 --> 00:29:17.145
Again, we negotiated the triple-A lease before we closed the deal.

412
00:29:17.605 --> 00:29:18.666
We knew what the rent was going to be.

413
00:29:18.706 --> 00:29:20.167
We knew what the escalators were going to be.

414
00:29:20.267 --> 00:29:23.909
We knew the responsibilities and who was going to be managing those.

415
00:29:24.189 --> 00:29:27.271
We knew the guarantee and the company behind the guarantee.

416
00:29:27.491 --> 00:29:32.254
We already had designed a major part of that income stream before deploying our investors' capital.

417
00:29:33.113 --> 00:29:36.215
And then third, complexity is not automatically risk.

418
00:29:36.736 --> 00:29:41.059
Sometimes complexity is exactly what keeps competition away and creates the opportunity.

419
00:29:41.239 --> 00:29:46.983
The key is understanding which parts of that complexity that you can control and making sure you can survive the parts that you can't.

420
00:29:47.623 --> 00:29:50.005
This is how we try to think about every single investment that we make.

421
00:29:50.585 --> 00:29:51.986
What happens if the plan works?

422
00:29:52.446 --> 00:29:54.187
What happens if it takes longer than expected?

423
00:29:54.227 --> 00:29:56.148
And what happens if it never works, right?

424
00:29:56.188 --> 00:29:57.449
If it doesn't go as planned.

425
00:29:58.129 --> 00:30:03.352
If the deal still makes sense under that third scenario, you're dealing with a very different kind of risk.

426
00:30:03.752 --> 00:30:05.773
So that is the story of the Clearwater Beach Garage.

427
00:30:06.113 --> 00:30:07.174
Again, it was complicated.

428
00:30:07.214 --> 00:30:10.598
It was frustrating, cost a lot of money, maybe some sleepless nights.

429
00:30:11.279 --> 00:30:14.843
And there were multiple moments when the full assemblage, it could have failed.

430
00:30:15.243 --> 00:30:17.846
But we didn't need everything to go right for that original investment to work.

431
00:30:18.086 --> 00:30:20.809
That gave us the ability to keep pushing the bigger opportunity.

432
00:30:21.110 --> 00:30:23.052
And ultimately, that's what this deal demonstrates.

433
00:30:23.232 --> 00:30:27.053
Really, the complexity was a major reason the opportunity even existed in the first place.

434
00:30:27.254 --> 00:30:30.655
And as investors, our job is to not eliminate uncertainty.

435
00:30:31.195 --> 00:30:37.357
It's really to understand the downside, build protections where we can, and be willing to execute when the risk-adjusted opportunity makes sense.

436
00:30:37.617 --> 00:30:38.898
I hope you enjoyed this case study.

437
00:30:38.918 --> 00:30:45.600
And, you know, again, we're going to continue doing more of these episodes, covering both our manufactured housing communities as well as structured parking investments.

438
00:30:45.961 --> 00:30:46.881
We're going to share all the wins.

439
00:30:46.901 --> 00:30:49.462
We're going to share also the challenges that go along with them.

440
00:30:50.042 --> 00:30:53.689
And we'll share what worked, what didn't work, and what we learned along the way.

441
00:30:53.950 --> 00:30:58.017
And as always, if you've enjoyed today's podcast, please do take a moment to leave us a rating and review.

442
00:30:58.498 --> 00:31:04.309
And share this episode with another investor who might find value in hearing the real story behind a complicated transaction.

443
00:31:04.710 --> 00:31:07.695
Until next time, this is Kevin Bopp wishing you huge success.

444
00:31:07.996 --> 00:31:08.457
Take care now.